DESCRIPTION
The scope of the proposed neighborhood improvement project was determined in Phase 1 (concept phase) of this project. The project scope was selected directly from the approved Richland County Neighborhood Master Plan and refined based on public and stakeholder input and available funding.
Phase 2 includes design and construction of the following:
Harrington Drive Sidewalk
Athena Drive Sidewalk
Green Springs Drive Sidewalk
Phase 3 consists of complete site work and traffic control including, but not limited to: construction of concrete sidewalks, pedestrian ramps, painted crosswalks and utility coordination and necessary utility adjustments along the following roads/streets within the Candlewood neighborhood;
Arcola Drive Sidewalk
Concourse Drive Sidewalk
North Chateau Drive Sidewalk